Minerals
ANSTO has provided the mining and minerals processing industries with consultancy, process development and research services for more than 40 years.
ANSTO has world-leading expertise in the processing of critical and strategic metals such as rare earths, scandium, lithium, zirconium, niobium, and hafnium.
Our experienced team of engineers, metallurgists, chemists and scientists have a proven track record of working with our clients in Australia and around the world to design and evaluate novel flowsheets and improve established processes.
Our research group carries out fundamental research uniquely applied to industrial problems in the areas of uranium, rare earth and lithium processing.
ANSTO has a full suite of mineralogical, chemical and hydrometallurgical facilities from laboratory through to pilot scale.
ANSTO supports a number of Cooperative Research Centres Projects (CRC-P) programs in the area of critical and strategic minerals. Current work includes:
Find out more
Definitive Feasibility
In a major step forward, Definitive Feasibility Study results for the Songwe Hill Rare Earths Project in Malawi, East Africa have been released this July by Mkango Resources. ANSTO has been involved in the project for a number of years supporting the DFS through optimisation and piloting programs conducted at our Lucas Heights facility.
The final hydrometallurgical pilot at ANSTO in late 2021 produced a mixed rare earth concentrate containing 55 wt% TREO equivalent, enriched in neodymium and praseodymium (Nd/Pr) oxides, which together made up 31% of the rare earth oxide content. The Songwe Hill deposit comprises mostly carbonaceous gangue minerals with the principal rare earth bearing mineral being synchysite (CaCO3·CeFCO3).
Test work
Mkango Resources (Mkango) have commenced preparation for hydrometallurgical pilot testing at ANSTO in support of the Songwe Hill Rare Earth Project in Malawi.
Mkango is currently piloting the up-front flotation process to produce sufficient mineral concentrate. This will be supplied to ANSTO for piloting of optimised hydrometallurgical processes, representing an improvement to that used in the Pre-Feasibility Study.
Mkango and ANSTO have been working together since 2017, our team is looking forward to supporting the project during this critical stage of the Feasibility Study.
Cost savings
ANSTO partnered with Marenica Energy Limited to evaluate strategies to reduce acid consumption during leaching for the Angela Uranium Deposit.
Successful demonstration of the rejection of calcite using Marenica's U-prgrade™ technology at ANSTO resulted in:
ANSTO is looking forward to working with Marenica on further development and optimisation of the calcite removal process.
IX optimisation
Boss Resources Ltd. has announced improved process economics for its Honeymoon Uranium Project in South Australia.
Recent optimisation test work on the ion exchange (IX) circuit of the process has identified the ability to remove heating during elution which positively impacts the project economics.
The IX process proposed for Honeymoon also uses a patented elution process developed at ANSTO.
ANSTO continues to work with Boss on it's revised Feasibility Study for the Honeymoon restart.
Our team is available to discuss commercial projects, consultancy, research or any other areas of our business that you might be interested in. Feel free to contact any one of the team members directly or email our group via [email protected].
Request a callback
Principal Consultant
Principal Consultant
Principal Consultant
For further information
Songwe Hill Rare Earth ProjectReduction of acidUranium extractionPrev: The End of Big Data
Next: Global specialty metals